Accurpress 2024 Addition
img-6673-bef2004f3c42.jpg

Accurpress 2024 Addition

Overview
This expansion included a 3,300 square foot addition to the existing Pre-Engineered Meal Building (PEMB). This expansion significantly enhances the facility, featuring intricate concrete work and advanced equipment accommodations. The new space includes complex concrete structures, such as pits and heavy plate embeds designed for Accurpress Equipment Testing. The floor elevation was dropped by 4 feet to accommodate the height requirements of the specialized equipment. The expansion utilizes PEMB construction that provides a versatile and open area. A new wheelchair lift was also installed to ensure accessibility to the lower floor elevation, reflecting a commitment to inclusivity. Additionally, the project extended 480 volt power to the new equipment testing pit, supporting the advanced needs of the expanded facility.
LocationRapid City, SD
ArchitectAvid4 Engineering
Size (square footage)3,300 square feet
×