The project consisted of construction of a new 33,000 sq. foot fire fighting facility. The building has 20 single bedrooms, full size kitchen, dining room, an entertainment/Recreation area, 8 drive-through bays for fire equipment trucks, and mechanical room with storage area. Architectural elements include brick veneer, architectural precast concrete, aluminum windows and doors, custom architectural woodwork and casework, ceramic tile, carpet, VCT, pre-fabricated sauna, overhead doors and electric operators. Sitework included utilities, asphalt paving, heated concrete paving, landscaping and irrigation.
Details:
- Concrete foundations on engineered fill.
- Slabs on grade.
- Structural precast concrete.
- Structural steel.
- Standing seam metal roofing.