DKC crews finishing up installation of the wood doors, windows, and wood trim. Muth Electric is almost complete with installation of the buildings new fire alarm system as well as wrapping up the new dimmable LED lighting system. Horst Acoustical is working on installation of the acoustical wall panel sound boards.