Dean Kurtz Construction is working on construction of the Borated Polyethylene Shielding mazes which are designed to block the trajectory of neutrinos from room to room while still allowing electrical, plumbing, fire sprinkler, and HVAC systems to pass through! Our subcontractors continue work on installing their systems with in the CASPAR cavern as well as the BHSU Cleanroom space.